• Detailed engineering (c/w structural analysis, lifting point verification, testing, etc.) and executive project of a modular platform system designed with a “C” shape for supporting a pier’s building operations.
  • Vessel mooring system analysis and detailed design and construction of the ultra heavy modular pontoons used as fenders.
  • Engineering documentation and analysis for a Ro-Ro mooring system inside Trieste harbour by using modular floating pontoon and Jack-Up system.
Print Friendly